    Mirabel Fish Ladder

     

    Mirabel Fish Screen and Fish Ladder Replacement

    Date Started: July, 2014

    Date Completed: February, 2017

    Final Contract Amount: $12,721,338

    Description:  The Work consisted of construction of a vertical slot fish ladder, fish screen with 6 intake bays and viewing gallery with 400 square feet of viewing windows.  Work included a temporary dam and rock fish passage upstream of the Wohler Bridge, pipe pile foundation system, fish screen cleaning system with a vertical traveling brush and controller. Water Agency staff utilizes video cameras to count the fish moving through the ladder and we bring over 3,000 students per year to the viewing gallery as part of the Westside Water Education Program.


     

     

    Westside

     

    Westside Water Education Center

    Date Started: October, 2014

    Date Completed: July, 2016

    Final Contract Amount: $2,108,766

    Description: The Work consisted of construction of a water education building at 9703 Wohler Road and also included a new driveway entrance and parking area.  This facility is the field study site for the Water Agency's Water Education Program.  Over 3,000 students visit the center each school year and learn about the connection between our drinking water and the Russian River, water quality parameters for endangered Russian River salmon and utilize the laboratory to discover the importance of water efficiency and aquatic life.


     

    Agua Caliente

     

    Sonoma Valley County Sanitation District Agua Caliente Creek Crossing

    Date Started: August, 2015

    Date Completed: June, 2016

    Final Contract Amount: $2,623,203

    Description: The Work consisted of replacing 620 linear feet of sewer trunk main, including removal and realignment of trunk main and removal of the above channel crossing of Agua Caliente Creek.  Work also included construction of 639 linear feet of HDPE pipe, 239 linear feet of siphon pipe and 133 linear feet of pipe rammed steel casing under Agua Caliente Creek.


     

    LWD 

    Procurement of Large Woody Debris

    Date Started: February, 2016

    Date Completed: August, 2016

    Final Contract Amount: $885,694

    Description: The Water Agency purchased over 1,000 large woody debris units to be used in the Dry Creek habitat enhancement projects.  Species include Redwood, Douglas Fir and Eucalyptus. These logs and root wads will be used to create habitats that reduce water velocities for Coho salmon rearing in Dry Creek.  The Project is one component of the National Marine Fisheries Service's Russian River Biological Opinion, which is a federally mandated blueprint to help save endangered fish and preserve Water Agency's regional water supply.

     


     

    West Robles Avenu

     

    SPCSD West Robles Avenue Collection System Replacement Project

    Date Started: May, 2016

    Date Completed: July, 2016

    Final Contract Amount: $292,160

    Description: The Work consists of construction of approximately 440 feet of sanitary sewer main in West Robles Avenue.  The Work includes the excavation, backfilling and surface restoration for the construction of the sewer main. This includes several manholes, laterals and modifications to existing manholes.  The Agency worked in conjunction with residents on West Robles Avenue to complete this Work quickly and mitigate disruptions.

     

     

     


     

     

     

    404 Roof Complete

    404 Aviation Boulevard Roof Replacement Project

    Date Started: June 2015

    Date Completed: September 2015

    Final Contract Amount: $1,053,715

    Description: The Work consisted of roof replacement of a 63,000 square foot, actively occupied office bu8ilding in Santa Rosa.  The Work included the removal and replacement of existing roof and removal and reinstallation of existing photovoltaic panels.

     


     

     

     

    Service Center Parking Lot, Phase II

    Date Started: October 2015

    Date Completed: June 2016

    Final Contract Amount: $275,632

    Description:  The Work consisted of construction of a parking lot at SCWA Service Center Facility. The Work included construction of a one-acre parking lot with lime treated subgrade, aggregate base wearing surface and lighting for Service Center staff.

     


     

     

     BNR Treatment Plant

    Russian River County Sanitation District Treatment Plant Biological Nutrient Removal

    Date Started: September 2013

    Date Completed: March, 2014

    Final Contract Amount: $2,509,660

    Description: Construction of a biological nutrient removal system at Russian River County Sanitation District’s treatment plant located at 18400 Neeley Road, Guerneville, California. Work includes the construction of baffle walls, pumping recirculation, micro diffuser aeration, blowers, mixers, motor control center, electrical panels, instruments, and controls.

     


     

    McGill Road Recycled Water Pipeline

    North Bay Water Re-Use Program - Sonoma Valley County Sanitation District

    McGill Road Recycled Water Pipeline

    Date Started: October, 2014

    Date Completed: March, 2015

    Final Contract Amount: $236,133

    Description: The work consists of construction of a recycled water pipeline along McGill Road crossing Highway 12, outside the City of Sonoma.  The Work includes installation of approximately 750 linear feet of recycled water pipe in a range of sizes with steel casing under Highway 12.

     


     

    Dry Creek Habitat Enhancement Project, Phase IIDry Creek Habitat Enhancement Project, Phase II

    Date Started: June, 2013

    Date Completed: January, 2015

    Final Contract Amount: $4,673,293

    Description: Construction of habitat modifications within the Dry Creek Valley along Dry Creek from approximately 1/2 mile upstream of Lambert Bridge Road to 1/2 mile downstream of Lambert Bridge Road near City of Healdsburg.  Work included habitat modifications, including new side channels, ponds, alcoves and rock riffles.  Enhancements were made to existing pools through selective grading, installation of woody debris, log jams and large boulders as anchor material.  New vegetation was planted and erosion control measures were put in place to maintain longevity of the project.

     


    Sonoma Valley County Sanitation District Biosolids Management UpgradeSonoma Valley County Sanitation District Biosolids Management Upgrade

    Date Started: May 2013

    Date Completed: September, 2014

    Final Contract Amount: $3,107,794

    Description: Upgrading the biosolids handling facility at the Sonoma Valley County Santiation District Wastewater Treatment Plant located at 22675 8th Street East, Sonoma, California.  Work includes the installation of a new screw press and construction of new equipment and load-out building. Work also includes removal of an existing belt press and conveyor, electrical, and preparation and painting of pump room in the existing dewatering building.

     


    Mirabel Site Seismic ImprovementsMirabel Site Seismic Improvements

    Date Started: December 2013

    Date Completed: August, 2014

    Final Contract Amount: $1,493,600

    Description: Work includes clearing, grading, utility protection and relocation, soil densification through vibro replacement methods, and quality control testing.

     


    South Park County Sanitation District Gloria Drive – Meekland Court Collection System Replacement and Gloria Drive & Valerie Way Water Main ReplacementSouth Park County Sanitation District Gloria Drive – Meekland Court Collection System Replacement and Gloria Drive & Valerie Way Water Main Replacement

    Date Started: October 2013

    Date Completed: September, 2104

    Final Contract Amount: $3,013,360

    Description: Work includes replacing approximately 6,570 feet of existing 6-inch and 8-inch sewer main pipe and appurtenant sewer laterals, manholes, and main line cleanouts with new 8-inch PVC sewer main and appurtenant sewer laterals, manholes, and main line cleanouts; replacing approximately 2,078 feet of existing 4-inch water main and appurtenant water services with new 8-inch PVC water main and appurtenance water services; and the addition of two new fire hydrants. Sewer-related Work is located on portions of Gloria Drive, West Avenue, Camellia Court, Valerie Way, Metaxa Court, Southwood Drive, Leo Drive, Meekland Court, Dutton Avenue, and Mathwig Drive and is within existing public sewer easements. Water-related Work is located on portions of Gloria Drive and Valerie Way. All Work is located in an unincorporated area outside the city
    limits of Santa Rosa.

     


    North Bay Water Reuse Program, Sonoma Valley County Sanitation District, Napa Salt Marsh Restoration Pipeline, (Carneros Reservoir to Huichica Unit)North Bay Water Reuse Program, Sonoma Valley County Sanitation District, Napa Salt Marsh Restoration Pipeline, (Carneros Reservoir to Huichica Unit)

    Date Started: March 2013

    Date Completed: November 2013

    Final Contract Amount: $ 4,480,053

    Description of Work: Construction of a recycled water transmission pipeline in an unincorporated area of Sonoma and Napa Counties. The Work included the  installation of approximately 18,200 lineal feet of 18- inch diameter recycled water transmission pipeline by means of direct bury, horizontal directional drilling or bore and jack; pipe appurtenances; and incidental related Work.

     


    Santa Rosa Aqueduct Seismic Hazard Mitigation (Rodgers Creek Fault Crossing)Santa Rosa Aqueduct Seismic Hazard Mitigation (Rodgers Creek Fault Crossing)

    Date Started: December 2012

    Date Completed: October 2013

    Final Contract Amount: $3,305,336

    Description of Work: Seismic hazard mitigation for the Owner’s Santa Rosa Aqueduct at the Rodgers Creek fault crossing, within the limits of the City of Santa Rosa, California, on Sonoma Avenue between intersections of Sotoyome and Doctors Park Drive. The Work included the installation of approximately 1,900 linear feet of 36-inch steel water pipe including related fittings and appurtenances, a new water meter turnout, a manifold system to allow for bypass flows, cathodic protection system, electrical service panel, conduits, and cables, and abandonment of existing meter vault and a portion of the existing aqueduct.

     


    Service Center Relocation (2025 Aviation Boulevard)      Service Center Relocation (2025 Aviation Boulevard)      

    Date Started: May 2012

    Date Completed: July 2013

    Final Contract Amount: $2,817,437

    Description of Work: Construction of a new building and remodeling of an existing building to for the Water Agency’s new Service Center at 2025 Aviation Boulevard, Santa Rosa, California.  Work included the construction of a pre-engineered metal building, grading, paving, mechanical, electrical, and related work. In addition, Work included construction of a pond loop system involving the heating, ventilating, and air conditioning system in the new building, which was a specific component of the Renewable Energy Secure Communities project.  The pond loop used the existing 100 million gallon recycled water storage pond as the heat dissipation source for heating and cooling of the new Service Center. The heating, ventilating, and air conditioning system in the new Service Center will circulate water in a closed loop through coils of plastic pipe installed at the bottom of the recycled water storage pond (pond loop). These coils of pipe will dissipate heat in the summer and absorb heat in the winter within the pond.

     


    Airport-Larkfield-Wikiup Sanitation Zone Treatment Plant Emergency Gas Scrubber SystemAirport-Larkfield-Wikiup Sanitation Zone Treatment Plant Emergency Gas Scrubber System

    Date Started: January 2011

    Date Completed: August 2013

    Final Contract Amount: $236,176

    Description of Work: Installation of an emergency gas scrubber system at Water Agency’s wastewater treatment plant located at 2025 Aviation Boulevard, Santa Rosa, California. Work included providing a concrete pad, ventilation ducts, electrical power and controls, and the emergency gas scrubber unit.

     


    Sonoma Tanks Fence ReplacementSonoma Tanks Fence Replacement

    Date Started: November 2012

    Date Completed: December 2012

    Final Contract Amount: $71,000

    Description of Work: Installation and replacement of security fencing around the Sonoma storage tanks at 1st Street West, near Spain Street, Sonoma, California. Work included the construction of approximately 1400’ of security fencing, and various types of gates.

     


    Dry Creek Habitat Enhancement Demonstration Project, Phase IDry Creek Habitat Enhancement Demonstration Project, Phase I

    Date Started: September 2012

    Date Completed:  November 2012

    Final Contract Amount: $184,748

    Description of Work: Construction of habitat modifications along Dry Creek at 4900 West Dry Creek Road near the City of Healdsburg, California.  Work included habitat modification including new side channels, ponds, and alcoves, and rock weir riffles; enhancements to existing pools through selective grading, installation of woody debris, log jams, and large boulders as anchor material;  vegetation planting; installation of erosion control measures; excavation; and dewatering.

     


    Russian River County Sanitation District Disinfection Upgrade ProjectRussian River County Sanitation District Disinfection Upgrade Project

    Date Started: May 2011

    Date Completed: September 2012

    Final Contract Amount: $2,630,133

    Description of Work: Construction of a new ultraviolet light (UV) disinfection system at the Russian River County Sanitation District treatment plant located 18400 Neeley Road, Guerneville, California. Work included a low-pressure, high-output UV disinfection system in a 2-channel concrete basin; a coagulation and flocculation tank and chemical feed equipment; and piping, electrical and other modifications at the treatment plant.

     


    North Bay Water Reuse Program - Sonoma Valley Effluent Reservoir R5 ProjectNorth Bay Water Reuse Program - Sonoma Valley Effluent Reservoir R5 Project

    Date Started: July 2011

    Date Completed: May 2012

    Final Contract Amount: $2,339,768

    Description of Work: Recycled water storage reservoir to the North of the Sonoma Valley County Sanitation District Wastewater Treatment Plant (WWTP) located at 22675 8th Street East, Sonoma, California.  The reservoir stores approximately 100 acre-feet of recycled water.  Work included construction of a recycled water storage reservoir lined with a high-density polyethylene (HDPE) liner; inlet, outlet, overflow piping, concrete pumping station, and pump; 18-inch recycled water pipeline; and electrical and telemetry work to connect the reservoir into the WWTP and recycled water system.